REDWAY BATTERY / KNOWLEDGE
How do you check rack batteries on arrival and store them before installation?

Redway Battery Editorial Team
Talk / Battery Q&A
An installer receives a pallet of rack modules two weeks before the site is ready and wants a receiving check that protects any damage claim and keeps the modules healthy in storage.
Direct answer: Inspect before you sign, document everything, then store correctly. Check the pallet and cartons for crush, puncture or tip damage and note it on the delivery receipt with photos. Match model and serial numbers to the packing list, open one or more cartons to check the case, handles and terminals, and record each module’s open-circuit voltage. Store the modules indoors, dry, off the floor and within the storage conditions in the manual, and recharge on the interval the supplier specifies if installation is delayed.
At the truck. Photograph the pallet before unloading. Write any visible damage on the carrier’s receipt before signing; a clean signature can weaken a later claim. See handling a transit damage claim.
Paperwork. Compare models and serials with the packing list and invoice, and check that transport documents and the test summary are on file; see UN38.3 documents to request.
Physical check. Handle modules with two people or a lift: the PM-LV51100-3U is listed at 42 kg, the PM-LV48100-3U at 39 kg and the PM-LV51200-5U at about 77 kg. Look for dents, cracked front panels, bent terminals and missing parallel cables or brackets.
Voltage record. Measure each module’s open-circuit voltage and note it against the serial. Modules from one shipment should read close to each other; a module far from the rest should be reported to the supplier before installation, not mixed into a bank.
Storage. The product pages list IP21 and dry indoor use, so store modules indoors, away from water, heat sources and direct sun, on shelving or pallets rather than a damp floor. Keep them in their cartons with breakers off.
Long delays. Self-discharge is low but not zero. If the site slips by months, follow the supplier recharge interval; storing and recharging inventory explains the routine.
Before install. Re-measure voltage, confirm inverter compatibility (compatibility check) and follow parallel commissioning steps.
Who receives the goods. Name one person to sign for battery deliveries, give them the checklist and a meter, and make sure they know where damaged items are quarantined. A missed note on the receipt is the most common reason a transit claim fails. Keep all photos, the signed receipt and the voltage log in one folder per shipment.
↳ Replying to Redway Battery Editorial Team
Write damage on the delivery receipt before signing and keep the photos with the order file.
↳ Replying to Procurement perspective
Record open-circuit voltage by serial on arrival; outliers should be resolved before they enter a parallel bank.
↳ Replying to Selection/Engineering perspective
Store dry, indoors, off the floor with breakers off, and log any recharge you do during long delays.
Inspect before you sign, document everything, then store correctly. Check the pallet and cartons for crush, puncture or tip damage and note it on the delivery receipt with photos. Match model and serial numbers to the packing list, open one or more cartons to check the case, handles and terminals, and record each module’s open-circuit voltage. Store the modules indoors, dry, off the floor and within the storage conditions in the manual, and recharge on the interval the supplier specifies if installation is delayed.
Verify before ordering: Storage temperature range and recharge interval are given in the user manual rather than on the product pages; ask Redway for the manual (available on request).
Editorial Q&A for battery selection and operations. Product figures cited from Redway product pages.
Related products
Related articles & discussions
- How Should You Properly Store LiFePO4 Batteries for Longevity?
- How do I check my battery level with a multimeter?
- What temperature damages lithium battery?
- 48V 200Ah Server Rack LiFePO4 Batteries: A Complete Guide for Modern Energy Storage
- How do you store 12V lithium batteries?
- How To Install And Maintain Golf Cart Batteries?
- How Easy is the Installation of LiFePO4 Golf Cart Batteries?
- Comprehensive Instructions for Battery Installation
- What is a server rack battery?
- Why You Should Not Store Lithium Batteries in the Freezer
51.2V 100Ah Server Rack Battery
51.2V 200Ah 10kWh Server Rack Battery (5U)
48V 100Ah Server Rack Battery