Buyer question

A purchasing team compares two lithium forklift battery offers. Both show the same row of logos, and nobody can say what each one actually proves.

Main answerRedway Battery Editorial Team

Main answer

Direct answer: Each mark answers a different question. UN38.3 is a set of transport tests a lithium battery design must pass before it can be shipped. UL 1642 is UL’s standard for lithium batteries and is commonly applied at cell level. IEC 62619 covers safety requirements for lithium cells and batteries in industrial applications. CE is the manufacturer’s declaration that a product meets the EU rules that apply to it. None of them replaces the truck maker’s approval. Ask for the documents, not the logos.

What the pages list: the 48V 280Ah, 48V 420Ah and 24V 280Ah tables show “Certification: UN38.3 / UL 1642 / IEC 62619 / CE”. Some smaller forklift pages list “UN38.3 / MSDS / UL1642 / IEC62619” instead. The pages do not show certificate numbers, test laboratories, dates or which level (cell, module or complete pack) each document covers.

UN38.3. These tests come from the UN Manual of Tests and Criteria and are a condition for transporting lithium batteries. US rules in 49 CFR 173.185 require each cell and battery type to be of a type proven to meet them, and the shipper must be able to provide a test summary. A UN38.3 result says the design passed transport tests; it is not an in-use safety approval. Our post on UN38.3 documents a buyer should receive covers how to check them.

UL 1642 and IEC 62619. UL 1642 is generally cited for the lithium cells inside a pack, so ask whether the document covers the cells, the pack, or both. IEC 62619 sets safety requirements and tests for secondary lithium cells and batteries used in industrial applications; ask for the test report and check that the model name and capacity match the battery you are buying.

CE. Under EU rules the manufacturer carries out the conformity assessment, keeps the technical file, issues the EU declaration of conformity and affixes the CE mark. Ask for that declaration and check which EU acts it lists. CE matters if the battery is placed on the EU market; it does not tell you anything about suitability for your truck.

What none of them cover: fit, weight and counterweight in a specific truck, the charger match, and the truck maker’s approval. OSHA’s truck rule, for example, requires the manufacturer’s prior written approval for modifications that affect capacity and safe operation; see fit and counterweight checks. File every certificate with the battery serial numbers it covers.

Procurement perspective

Reply

↳ Replying to Redway Battery Editorial Team

Request the certificate or report for each mark, with number, issuing body, date and model scope. A logo on a web page is a starting point, not evidence.

Selection/Engineering perspective

Reply

↳ Replying to Procurement perspective

Read the scope line of each document: cell, module or pack; model name; capacity and voltage. A cell-level report does not prove the assembled pack, BMS and case were tested.

Maintenance perspective

Reply

↳ Replying to Selection/Engineering perspective

Keep copies in the asset file with the serial numbers. Transport, insurance or a later warranty claim can all ask for them, and suppliers change cells over time.

Each mark answers a different question. UN38.3 is a set of transport tests a lithium battery design must pass before it can be shipped. UL 1642 is UL’s standard for lithium batteries and is commonly applied at cell level. IEC 62619 covers safety requirements for lithium cells and batteries in industrial applications. CE is the manufacturer’s declaration that a product meets the EU rules that apply to it. None of them replaces the truck maker’s approval. Ask for the documents, not the logos.

Verify before ordering: Certificate numbers, laboratories and scope (cell vs pack) are not shown on the product pages; request them from Redway per model.

Sources checked: 49 CFR 173.185 (eCFR); IEC 62619 (IEC webstore); CE marking (European Commission).

Editorial Q&A for battery selection and operations. Product figures cited from Redway product pages.

Related products

Related articles & discussions

redway-power-lithium-battery-engineer

Want a custom offer for lithium batteries? Contact our sales engineers now for A Quick Quote.